Description : The petrodynamic test circulates oil at the working pressure authorized without a recent hydrostatic test
Goal : see financial impact
Leave To Open (LTO): The petrodynamic test happens after authorization to operate is granted
Overflow product : oil
Financial impact : earns money
Duration : as long as possible
Recommended by : ?
History: none yet for 9B, but already happened once on 6B
Information about 9B :
National Energy Board position on this? If Enbridge proves to the Board’s satisfaction that the pipeline is safe, that there is the required level of reliability in the line, then hydrostatic testing may not be required.